Turner ECS has recently supplied five new control panels and two engineering workstations for the turn-around of MLO plants 1 and 2 at Shell Moerdijk. The control panels include 5009FT turbine speed controls and ProTech-GII overspeed protection systems and replace the previous panels due to hardware obsolescence. Services provided by Turner ECS include drafting and design, application and HMI engineering, factory and site acceptance tests, updating documentation and project support.